Milltown Island Estuary Restoration

The Milltown Island restoration improves tidal exchange by removing sections of the existing levee and constructing additional tide channels. AGC Build WA Award Winner.

Project Specifications

Location: Conway, WA
Square Footage: 2.5 acres / 13 channels
Delivery: Bid

Removal and placement of approximately 30,000 cy of levee and channel material, grading, embankment, and rough restoration. Nearly 2.5 acres of levee were removed across 22 locations. The excavated material was used to form wetland habitat mounds which will be planted with native species to create scrub-shrub and forested tidal wetlands. The 13 new channel networks that were excavated totaled approximately 9,050 feet, creating blind tide channels and tidal headwaters. Four 30” culverts were also removed during the project and replaced with tide channels. These features help to restore the island for species like salmon, beaver, birds, and other wildlife.