TRICO performed repair work to the Fir Island Levee for Washington State Department of Fish and Wildlife. Work included installing sheet piling, dredging, re-grading, installation of armor rock and resurfacing the top of the levee. Repairs were required due to erosion and sediment accumulation within the channel. This project represents another successful project by TRICO’s civil team!